A data-room UPS discharges for minutes, not hours, and sits at float for the rest of the year. That duty rewards a chemistry that holds charge quietly and delivers current instantly.
What the rack needs
| UPS class | Runtime | String |
|---|---|---|
| Server room 10–20 kVA | 10–15 min | 48 V, 100–200 Ah |
| Data hall 100 kVA | 5–10 min | Higher-voltage strings |
| Edge cabinet | 5–30 min | 48 V, 50–100 Ah |
Short runtime means high rate. A 100 Ah pack delivering 200 A is a 2C discharge, which is ordinary for sodium and hard on a small lead-acid block.
How to size the string
1. Load. Take the real IT load, not the UPS rating. A 20 kVA UPS is often loaded to 12 kVA.
2. Runtime. kWh needed = load × hours. A 12 kW load for 15 minutes is 3 kWh.
3. Rate check. 12 kW from a 48 V string is 250 A. Confirm the pack’s continuous rating at the aisle temperature, and that the inverter’s DC input can accept the string’s voltage window.
Temperature in the room
Server rooms run at 22–27 °C, which is kind to any chemistry. The problem is usually the battery room, not the data hall. Sodium’s advantage is that a cold room needs no heating and a warm room needs no active cooling at moderate rate.
What to specify
Runtime at the actual load, ambient range, communication to the UPS (dry contact, RS485 or CAN), and the reporting the facilities team needs. Without the communication, the UPS cannot know the pack’s state and will treat it as a dumb string.
Where it is the wrong choice
An existing compliant VRLA string. Replacing it early buys nothing.
A legacy UPS with a fixed voltage window. If it cannot be told the pack’s limits, a different chemistry adds risk.
Questions buyers ask
Can the UPS charge it directly?
If the float and recharge voltages sit inside the pack’s window, yes. Otherwise the UPS needs a different profile.
Will it need more cooling?
At short runtime, self-heating is small. The bigger factor is the room temperature the string sits in.
How do we test runtime?
With a controlled discharge at commissioning and annually. Ask for the state-of-health trend, not just a pass or fail.
Is it a drop-in for a 48 V string?
Electrically yes, with the right settings and communication. The rack, terminals and fuse must match.