Skip to content
New product 12 V 100 Ah sodium-ion truck starting battery, 1500 CCA, Group 31T See the launch →

Shipping and delivery

Home / Shipping and delivery

Sodium-ion cells and packs ship as Class 9 dangerous goods, so the documents and the packaging are part of the product, not an afterthought. This page explains what leaves the factory, when, and what travels with it.

Production time

Order type Production time
Stock item 3–5 working days
OEM — silk print, label or packaging only, same structure and BMS 15–20 working days
New ODM — new structure, BMS protocol, housing tooling or diesel-to-electric conversion 30–35 working days
Adding a certification +15–30 days

All figures count from specification freeze and confirmed deposit. We publish no shipping transit time, because it depends on the forwarder, the route and the season; ask for a current rate when you place the order.

Documents that travel with the goods

UN 38.3 test summary, MSDS, the dangerous goods declaration and the packing list. Air freight needs the test summary in the shipper’s hands before booking; sea freight needs the same documents at the port. Missing paperwork stops a container at the terminal, which is why these are prepared with the batch rather than after it.

Packaging

Cells ship in trays with terminal protection; packs ship in foam-lined cartons or in a wooden case above the weight limit. Each carton carries the model, the quantity and the lot number, so a claim can be traced to the batch that produced it.

Incoterms and freight

The default Incoterm is FOB Shenzhen; tell us whether you need EXW, FOB or CIF and we will quote on that basis. Freight, insurance and destination charges are quoted separately from the product price.

Inspecting on arrival

Check the carton count against the packing list before signing for the delivery. Photograph any crushed or wet carton before opening it, and report damage within 7 days so the claim reaches the forwarder inside their window.