Business

Where sodium-ion pays

Sodium-ion is not cheaper than lead-acid on day one, and it is not lighter than LFP. It pays where the duty cycle is long, the temperature is unkind, or the site cannot afford a thermal system. These are the four cases we model most often — with the numbers that decide them.

What you could actually build

Ten deployments that are being built today with sodium-ion packs. Each line gives the capital and the payback — open it for one way of sequencing it, and for what sits on your side of the line. These are models to discuss, not investment advice: your own site, tariff and permits decide the outcome.

DeploymentInvestmentPaybackWhat decides itFit
Two-wheeler battery swap cabinets 18–35 k USD per cabinet, packs 350–500 USD each 2.5–4 years at 70%+ utilisation Utilisation and pack theft Strong

One way to sequence it, not the only way. If your team already has a plan, start from step one you disagree with and take it from there.

Typical steps — adapt them to your own plan
  1. Pick sites with 300+ riders within 500 m — a market, a dormitory gate, a delivery depot.
  2. Check the incoming supply: 10–15 kW per cabinet, single phase is often enough.
  3. Start with one cabinet and 25 packs; 8–12 swaps per bay per day covers the rent.
  4. Negotiate the land: shops take a revenue share, depots take a flat rent.
  5. Fit each pack with a swap-proof connector and an ID the cabinet logs.
  6. Operate on a monthly subscription, not per-swap — it makes revenue predictable.
  7. Add a cabinet only when the first runs above 60% of its bays in peak hours.

We provide: Pack, BMS, charger inside the cabinet, CAN protocol, spare packs.

You provide: Site lease, mains connection, cabinet metalwork, staff, payment app.

Every project is different — check the numbers against your own site, tariff, permits and local rules before committing capital. This page is a model, not an investment recommendation. Investment carries risk.

Parking-lot charging with a buffer pack 180–420 k USD 5–7 years on fees; 3–4 with demand-charge savings Utilisation and the grid connection you already own Strong

One way to sequence it, not the only way. If your team already has a plan, start from step one you disagree with and take it from there.

Typical steps — adapt them to your own plan
  1. Count the cars that already park there for 2 h or more — that is your base load.
  2. Ask the utility for the existing transformer capacity before designing anything.
  3. Size the buffer so peak charging never exceeds that capacity.
  4. Install 4–8 DC chargers first; AC points only pay where dwell time is 4 h+.
  5. Set a tariff that rewards off-peak charging — it is what fills the buffer.
  6. Agree a revenue share with the landlord instead of a fixed rent where possible.
  7. Add chargers when average utilisation passes 15%.

We provide: Buffer pack, PCS, EMS that caps the site demand, charger integration.

You provide: Parking lease, civil works, charger hardware, grid application, operations.

Every project is different — check the numbers against your own site, tariff, permits and local rules before committing capital. This page is a model, not an investment recommendation. Investment carries risk.

Peak-shaving for an industrial site 160–260 k USD per MWh installed 3.5–5 years The tariff structure — demand charge, not energy price Strong

One way to sequence it, not the only way. If your team already has a plan, start from step one you disagree with and take it from there.

Typical steps — adapt them to your own plan
  1. Pull 12 months of bills and find the 15-minute peak the site is charged on.
  2. Model the shave: most sites can cut 20–30% of the peak with 0.5–1 MWh.
  3. Check the LV switchgear has a spare breaker bay for the PCS.
  4. Place the container outdoors or in a ventilated room; no cooling plant needed.
  5. Sequence it with existing loads so the shave does not fight production.
  6. Log the peak every month — the saving only shows if the peak stays down.

We provide: Pack, PCS, EMS with peak control, commissioning and the tariff model.

You provide: Bill data, switchgear access, civil base, site electrician.

Every project is different — check the numbers against your own site, tariff, permits and local rules before committing capital. This page is a model, not an investment recommendation. Investment carries risk.

Telecom and cold-store backup 300–600 USD per kWh installed 4–6 years against lead-acid replacement Outage frequency and the cost of a diesel run Strong

One way to sequence it, not the only way. If your team already has a plan, start from step one you disagree with and take it from there.

Typical steps — adapt them to your own plan
  1. Measure real autonomy needed — most sites are specified for twice what they use.
  2. Check the existing 48 V string voltage and the rectifier charge profile.
  3. Replace one site first and log a full year before rolling out.
  4. Keep the same footprint so the swap is a like-for-like replacement.
  5. Set the low-temperature charge cut-off and document it for the maintenance crew.
  6. Roll out site by site, keeping the removed lead-acid for scrap value.

We provide: 48 V packs with matching form factor, BMS, charge profile settings.

You provide: Site access, rectifier settings, removal and disposal, monitoring link.

Every project is different — check the numbers against your own site, tariff, permits and local rules before committing capital. This page is a model, not an investment recommendation. Investment carries risk.

Off-grid site replacing a diesel generator 250–500 k USD 3–5 years where diesel is delivered by truck The delivered cost of diesel, not the pump price Strong

One way to sequence it, not the only way. If your team already has a plan, start from step one you disagree with and take it from there.

Typical steps — adapt them to your own plan
  1. Log the generator hours and the load profile for four weeks.
  2. Get the delivered diesel cost — transport is often 30–50% of the bill.
  3. Size PV for daytime load, battery for night and cloudy days, generator as backup.
  4. Keep the generator; it becomes the winter or emergency source, not the base.
  5. Agree who fuels and services it — often the reason these systems fail.
  6. Train one local operator; remote monitoring does the rest.

We provide: Pack, hybrid inverter, EMS with generator start, remote monitoring.

You provide: PV array, civil works, fuel logistics, local operator.

Every project is different — check the numbers against your own site, tariff, permits and local rules before committing capital. This page is a model, not an investment recommendation. Investment carries risk.

Electric heavy-truck swap station 0.5–1.0 M USD per station plus packs 4–6 years, only with a committed fleet Route density and a fleet owner who signs first Neutral

One way to sequence it, not the only way. If your team already has a plan, start from step one you disagree with and take it from there.

Typical steps — adapt them to your own plan
  1. Map one fixed route with a single haulier before buying anything.
  2. Agree the pack standard with that haulier — pack size decides the whole station.
  3. Secure the land at the midpoint; 150–200 km between swaps is typical.
  4. Decide who owns the packs: the haulier, a leasing company, or you.
  5. Build one station and run it for six months before the corridor.
  6. Only then add stations; each new one needs the same signed fleet.

We provide: Pack, BMS, swap interface, station electrical design.

You provide: Land, station construction, robot or manual swap equipment, fleet contract.

Every project is different — check the numbers against your own site, tariff, permits and local rules before committing capital. This page is a model, not an investment recommendation. Investment carries risk.

Forklift and lead-acid replacement 450–700 USD per kWh, no charger change 2–3 years against lead-acid total cost Shift pattern — the more shifts, the faster the payback Strong

One way to sequence it, not the only way. If your team already has a plan, start from step one you disagree with and take it from there.

Typical steps — adapt them to your own plan
  1. Count the shifts and the battery changes per day — that is the real cost.
  2. Measure the battery box so the pack drops in without modifying the truck.
  3. Check the existing charger voltage and current; most need a profile change only.
  4. Start with the trucks that run three shifts — they pay back fastest.
  5. Remove the changing room and watering schedule; that is half the saving.
  6. Convert the rest of the fleet as the lead-acid sets reach end of life.

We provide: Pack in the original box, BMS, charger profile, counterweight check.

You provide: Fleet list, charger access, fitting labour, old battery disposal.

Every project is different — check the numbers against your own site, tariff, permits and local rules before committing capital. This page is a model, not an investment recommendation. Investment carries risk.

Cold-region residential or C&I storage 350–550 USD per kWh installed 5–8 years depending on the tariff The tariff and whether a heater would have been needed Strong

One way to sequence it, not the only way. If your team already has a plan, start from step one you disagree with and take it from there.

Typical steps — adapt them to your own plan
  1. Check whether the space is heated — if it is, the sodium advantage shrinks.
  2. Size for the evening peak and one outage, not for the whole day.
  3. Confirm the inverter is on the approved list for the grid operator.
  4. Install indoors or in an unheated garage; no thermal management hardware.
  5. Set the reserve for backup so the arbitrage never eats the safety margin.
  6. Review the tariff once a year; these projects live or die on the price spread.

We provide: Pack, BMS, inverter-compatible CAN profile, low-temperature cut-off settings.

You provide: Inverter, mounting, electrical inspection, grid registration.

Every project is different — check the numbers against your own site, tariff, permits and local rules before committing capital. This page is a model, not an investment recommendation. Investment carries risk.

Heavy-truck corridor swap, battery as a service 0.6–1.2 M USD per station, packs on a lease book 5–7 years for the asset owner A signed corridor with 30+ trucks a day, and a financier Neutral

One way to sequence it, not the only way. If your team already has a plan, start from step one you disagree with and take it from there.

Typical steps — adapt them to your own plan
  1. Separate the two businesses: the haulier buys trucks, the asset owner buys packs.
  2. Price per km, not per kWh — that is what the haulier can compare with diesel.
  3. Get a financier to underwrite the pack book before the first station.
  4. Standardise one pack for the whole corridor, or the swap bays will not work.
  5. Contract the maintenance of packs to one party; split responsibility kills this model.
  6. Expand station by station along the same corridor, not across the country.

We provide: Pack and BMS specification, swap interface, pack health monitoring.

You provide: Station build, pack financing, truck conversions, haulier contracts.

Every project is different — check the numbers against your own site, tariff, permits and local rules before committing capital. This page is a model, not an investment recommendation. Investment carries risk.

Grid-side frequency regulation storage 180–280 k USD per MWh installed 4–7 years where a regulation market exists Whether your market pays for regulation, and the C-rate it demands Neutral

One way to sequence it, not the only way. If your team already has a plan, start from step one you disagree with and take it from there.

Typical steps — adapt them to your own plan
  1. Read the grid operator qualification rules before designing the system.
  2. Check the required response time and C-rate — that decides the cell choice.
  3. Get the cycle-life data the market asks for, or the project will not qualify.
  4. Site near a substation with spare capacity; connection cost dominates otherwise.
  5. Model revenue on the actual regulation price history, not on a brochure figure.
  6. Plan the second revenue stream (energy arbitrage) as the regulation price falls.

We provide: Pack and BMS with cycle data, PCS integration, grid-code documentation.

You provide: Market registration, PCS, grid connection, SCADA link, bidding operations.

Every project is different — check the numbers against your own site, tariff, permits and local rules before committing capital. This page is a model, not an investment recommendation. Investment carries risk.

Capital and revenue are ranges from projects we have modelled or seen, in USD, before local incentives. They are not quotes. The decisive column is the one worth arguing about — everything else follows from it.

Four cases that usually pay

Each card states the assumption it rests on. Change one and the payback moves — that is the point of modelling it rather than promising it.

Depot fleet, 40 trucks

Investment4.8 – 6.2 M USD
Return per year1.1 – 1.4 M USD
Payback4.1 – 4.6 years

High annual distance, overnight charging on cheap tariff, one depot to wire.

Assumes: 120,000 km per truck per year, 28 L/100 km replaced, electricity at 0.15 USD/kWh, maintenance 0.03 USD/km.

Peak shaving on an industrial site

Investment0.35 – 0.5 M USD per MWh
Return per year90 – 130 k USD per MWh
Payback3.4 – 4.2 years

Demand charge removed twice a day; the pack cycles hard and sodium tolerates it.

Assumes: Two cycles per day, 350 days, demand charge 12 USD/kW-month, 80% depth of discharge.

Cold-store and winter telecom backup

Investment0.42 – 0.6 M USD per MWh
Return per yearnot fuel — avoided diesel runs and outages
Payback5 – 7 years, or one avoided outage

Below −10 °C lead-acid loses capacity and LFP needs heating; sodium keeps most of it and needs no heater.

Assumes: −20 °C ambient, 6 h autonomy, 60 outages avoided per year, diesel run cost 4 USD/kWh.

Marine and off-grid where weight is not critical

Investment0.5 – 0.7 M USD per MWh
Return per yearfuel and generator hours
Payback4 – 6 years

Displacement hulls and island sites can carry the extra kg; generator hours drop sharply.

Assumes: Generator at 0.35 load factor, diesel at 1.5 USD/L, 1,200 running hours replaced per year.

These are models, not customer references. The numbers come from the tariff and duty cycle stated on each card — we will run them against your own figures before anyone quotes anything.

Run your own numbers

Pick the deployment closest to yours, then put in your own unit count, yearly revenue per unit and capital cost. Everything is in USD per year, before tax and incentives.

Units
Revenue per unit per year
USD
Capital per unit
USD

Why sodium-ion, and where it is not the answer

Six numbers that decide the argument. Sodium wins four, LFP wins two — energy density and cycle life. Both of those matter if the job is long-haul or the space is tight.

Capacity left at −20 °C
90%sodium-ion
70–80%LFP
50–60%lead-acid
Charging below 0 °C
No heater neededsodium-ion
Heater requiredLFP
Charges, at half capacitylead-acid
Cycles to 80% capacity
3,000–5,000sodium-ion
4,000–6,000LFP
500–1,000lead-acid
Cell energy density, Wh/kg
100–120sodium-ion
150–180LFP
30–40lead-acid
Thermal runaway onset
Highersodium-ion
MiddleLFP
Low, but gassinglead-acid
Critical materials
No lithium, no cobaltsodium-ion
Contains lithiumLFP
Contains leadlead-acid
DecisionSodium-ionLFPLead-acid
Lowest price per kWh today——✔
Cost per cycle over ten years✔✔—
Capacity at −20 °C✔ 90%70–80%50–60%
Charging below 0 °C✔ no heater in most buildsheater requiredtolerates, at half capacity
Thermal runaway risk✔ lowerhigherlow, but gassing
Energy density—✔—
Exposure to lithium price✔ noneexposedlead exposed
Recycling infrastructure—established✔ mature

Send us the duty cycle

Give us the distance or the hours, the tariff and the temperature, and we will send back a modelled payback with the assumptions written down — before any hardware is quoted.

Request a business case

Two questions about the business case

What does storage actually cost per kWh delivered?

Levelised cost is capex divided by lifetime throughput, adjusted for round-trip efficiency — and the pack is typically 40–60% of a cabinet, so a 20% cell price difference moves the result by about 10%.

Which model suits a site with no grid connection?

Off-grid projects are sized by the worst month, not the average: daily consumption times autonomy days, divided by usable depth of discharge and then by the temperature derating at the coldest design point.

Still deciding?

Working on a distribution or OEM agreement? Tell us the market, the volumes and the certification you need, and we will answer with terms rather than a brochure.

Request a quote

The payback depends on the pack — size it in the tools and come back with a real number.