A telecom site is a battery that waits. It sits at full charge for years in a cabinet that may be 45 °C in summer, and one day it has to carry the site for four hours without warning.
What the site needs
| Site type | Typical string | Autonomy |
|---|---|---|
| Macro BTS cabinet | 48 V, 100–200 Ah | 2–4 h |
| Small cell / pole | 48 V, 50 Ah | 1–2 h |
| Hub site | 48 V, 300–500 Ah | 4–8 h |
| Data room UPS | 48 V or 240 V string | 10–30 min |
A 75 Ah prismatic cell at 3.0 V gives a 16S 48 V string; an 18 Ah cylindrical cell reaches 3,000 cycles at 0.5C in the same nominal voltage. Neither needs heating to sit ready in a cold cabinet.
How to size the string
1. Load. A macro site draws 1–3 kW; a small cell, 200–600 W. Multiply by the autonomy hours required by the operator’s standard.
2. Divide by usable depth and derating. A 48 V 100 Ah string holds 4.8 kWh; at 80% depth and 45 °C ambient, plan on less.
3. Check recharge current. After an outage the string has to recharge before the next one. That is a charger question, and a low charge rate means a long vulnerable window.
Float life and temperature
Capacity loss on a string that never cycles is calendar ageing, driven by temperature and state of charge. A cabinet at 35 °C costs noticeably more life than one at 25 °C, whatever the chemistry. Sodium tolerates a wider ambient range before derating, so the cabinet’s cooling requirement drops.
What the operator needs to see
State of health, internal resistance trend and cell temperature, reported remotely. The question after year four is not “what is the voltage” but “will it still carry the load for the rated time” — a BMS that only reports voltage cannot answer it.
Where lead-acid still wins
Short-life sites. A site due for decommissioning in three years does not need a long-life pack.
Established maintenance contracts. Where the operator’s model is built around scheduled lead-acid replacement, changing chemistry changes the contract.
Questions buyers ask
Is it a drop-in for a 48 V lead-acid string?
Electrically yes; the float and equalisation settings must change, and the equalisation cycle must be disabled.
Will it work in an outdoor cabinet at −20 °C?
Yes for discharge. Charging below the cell’s floor must be blocked or the pack warmed.
What communication do sites need?
Typically RS485 or CAN to the site controller, with dry contacts for alarms. Specify it with the enquiry.
How do I know when to replace it?
From the state-of-health trend rather than the calendar. A string that still delivers rated autonomy is not due for replacement.