An off-grid system is a battery problem disguised as a solar problem: the array is sized by the worst month, and the battery is sized by the nights in that month. Temperature decides how much of the battery you actually get.

Two climates, one chemistry

In a desert site the pack sits in 45 °C air and cycles every day. In an arctic site it sits at −30 °C for months and must still accept charge when the generator runs.

A sodium bank narrows the thermal design in both directions: it does not need heating to discharge in the cold, and it tolerates a wider ambient range before derating in the heat.

Sizing the bank

Start from the worst month’s daily consumption, multiply by the autonomy days required, divide by usable depth of discharge, then divide again by the temperature derating at the coldest design point.

That last division is where projects fail: a bank sized at 25 °C will not deliver the same autonomy at −30 °C, whatever the chemistry.

Generator hybrid control

Most off-grid systems keep a generator. The control strategy decides fuel burn: start on state of charge, run at efficient load, charge the bank in one block rather than many small starts.

Sodium’s charge acceptance makes a single high-rate block practical, which is the cheapest generator hour you can buy.

What to specify

Autonomy days, worst-month consumption, coldest and hottest design temperatures, generator size, and the inverter’s charge profile. Those five numbers produce a bank size; everything else is packaging.

Cells that tolerate an uncontrolled enclosure

Off-grid banks are usually built from 20 Ah or 55 Ah prismatic cells. The 20 Ah format has discharge curves recorded at 55 °C, 0 °C and −40 °C; the 55 Ah format is quoted at 4,000 cycles at 0.5C. Neither needs heating to discharge — which is the point in a shed in winter.

Where to go next

Questions we get asked about this

How many days of autonomy should I design for?

Two to three days is common for critical sites, more where generator fuel is expensive to deliver.

Does cold reduce my autonomy?

Yes. Divide usable capacity by the derating at the coldest design temperature, not by the 25 °C figure.

Can sodium charge from a generator faster?

It accepts a higher charge rate over a wider window than lead-acid, so generator runs can be shorter and more efficient.

Products for this application

ESS 4 models · specs and sizes 25 kW / 40.9 kWh high-voltage C&I ESS cabinet single product · full specification

Have a specification question this article does not answer? Send it with the numbers you already have.

Request a quote

Part of

More guides in this group