LCOS is not a property of a chemistry. It is capital cost divided by the energy a system moves over its life, adjusted for round-trip losses and replacements.

The formula without ceremony

Total capital cost, plus the present value of replacements and O&M, divided by lifetime discharged energy. That energy is annual throughput times years, times efficiency, times the capacity still available in the final year.

A cheaper pack with a short life often loses to a dearer pack that cycles more. That is the whole argument for sodium in daily-cycling duty.

What moves the number

Cycles per year: one versus two cycles changes LCOS by nearly half. Depth of discharge: deeper uses more capacity but shortens life, and the optimum is usually below 100%.

Capex: the pack is 40–60% of a cabinet, so a 20% cell price difference is about a 10% LCOS difference. The tariff spread does not change LCOS — it decides whether the project exists.

Indicative 2026 ranges

Sodium (NFPP) LFP Lead-acid
Capex per kWh 150–220 USD 140–200 USD 90–130 USD
Cycles at 80% DoD 4,000–8,000 3,000–6,000 400–800
Round-trip efficiency 88–92% 92–95% 75–85%

These move quarterly. The interesting column is the last one: lead-acid is cheap to buy and expensive per cycle.

How to use it

Build the model with your own tariff and cycles, then test sensitivity. If a 20% change in cycle life flips the decision, chemistry did not decide it.

If the project only pays back on optimistic assumptions, it does not pay back.

Cycle numbers to model with

Use the measured set rather than a brochure figure: 1,000 cycles at 1C on a 0.9 Ah high-rate cell, 2,000 at 0.5C on a 7 Ah pouch, 3,000 on an 18 Ah cylindrical, 4,000 at 0.5C on a 55 Ah prismatic. Put the one that matches your duty into the model — the spread between them is a factor of four in lifetime throughput.

Where to go next

Questions we get asked about this

What LCOS should I expect in 2026?

For daily-cycling C&I duty, published modelling commonly lands around 0.10–0.18 USD/kWh depending on tariff, cycles and capex.

Which assumption moves LCOS most?

Cycles per year, then capex, then efficiency. Doubling daily cycles nearly halves LCOS.

Products for this application

Sodium-ion Batteries 62 models · specs and sizes Prismatic Cells 20 models · specs and sizes 10145138 Sodium-ion Cell, 10 Ah, Pouch single product · full specification

Have a specification question this article does not answer? Send it with the numbers you already have.

Request a quote

Part of

More guides in this group