Skip to content
New product 12 V 100 Ah sodium-ion truck starting battery, 1500 CCA, Group 31T See the launch →
Home / Products / Packs / ESS / 500 kVA / 1028 kWh containerised ESS
Setting for a commercial energy storage cabinet

Commercial energy storage

Power that stays on.

Modular cabinets for resorts, plants and sites that cannot afford a brownout.

500 kVA / 1028 kWh containerised ESS Request a quote

500 kVA / 1028 kWh containerised ESS

CE, MSDS, UN38.3 and ISO certified

Product features

Specification

PV power
120 kW × 4
Rated MPPT voltage range
600–900 V
Maximum input current
200 A × 4
Output power
500 kVA
Maximum output power
550 kVA
Output AC voltage
400 / 230 V
Maximum output current
796.4 A
Current harmonics
<3% (≥30% load)
Power factor
−1 to 1
PCS dimensions (W×D×H)
1350 × 800 × 2200 mm
Battery
819.2 V / 314 Ah × 4 / 1028 kWh
Battery clusters
4
Charging temperature
0 to +55 °C
Discharging temperature
−20 to +60 °C
Communication
WiFi
Protection class
IP54
Weight
about 16 t
System dimensions (W×D×H)
6058 × 2438 × 2896 mm
Rated power
500 kVA
Rated energy
1028 kWh
Battery voltage
819.2 V
Battery capacity
314 Ah × 4
System dimensions
6058 × 2438 × 2896 mm
System weight
about 16 t

Ordering: MOQ and lead time

These figures are quoted by order type rather than per part number, because the same cell can ship from stock or start a new tooling project. If your quantity sits between two rows, the smaller one applies until a change is needed.

Minimum order quantity

Sample evaluation 1 unit A single piece, so you can test the chemistry and the fit before committing to a batch.
Standard catalogue item 5–10 units The stocked line: cells, cases and components that need no change before shipping.
New ODM design 100–200 sets New structure, new BMS protocol or new housing tooling. The batch size covers the setup work.
Large project quoted per project Container-scale and framework agreements are quoted against the schedule, not against a unit price.

Production lead time

Stock item 3–5 working days Shipped from stock once the order is confirmed.
OEM (silk print, label, packaging only) 15–20 working days Same structure and same BMS. Only the marking and the packaging change.
New ODM (new structure, BMS protocol, housing, diesel-to-electric) 30–35 working days Counted from specification freeze, not from the enquiry.
Adding a certification +15–30 days On top of the production time above. The laboratory sets the schedule, not us.

Shipping transit is quoted separately and starts after production finishes. We do not publish a transit figure, because it depends on the forwarder, the route and the season — ask for it with the order and we will quote the current rate.

Questions buyers ask

What are the dimensions?

1350 × 800 × 2200 mm. Check the mounting space against this figure rather than against the catalogue photo, because the enclosure adds wall thickness on every side.

How much does it weigh?

about 16 t. For freight the packed weight is higher: crating and pallet add to this figure, so ask for the shipping weight when you book.

Full A4 datasheet, one page. We store the address to answer you — nothing else.

Request a quote
WhatsApp Request a quote