Skip to content
New product 12 V 100 Ah sodium-ion truck starting battery, 1500 CCA, Group 31T See the launch →
Home / Products / Components / Welding Tips & Electrodes / Welding tip PT-WT-R203, dia 20.3 mm
Welding tip PT-WT-S26D · Ø26 mm

Welding tip PT-WT-R203, dia 20.3 mm

Brand: Polytone
Part number: PT-WT-R203
Availability: In stock
Price on request — quoted per configuration, quantity and Incoterm.Ask for a price →

Round copper welding tip for battery tab spot welding. Bore Ø20.3 mm, part number H09-040B.

Use: cell tab and busbar spot welding on pack assembly lines. The bore sets the weld spot size; round tips suit single-point welds, square tips suit wider pads and multi-point patterns.

Specification

Welding tip PT-WT-R203, dia 20.3 mm — specification
Part numberPT-WT-R203
ShapeRound
BoreØ20.3 mm
MaterialCopper
ApplicationBattery tab spot welding
ReferenceH09-040B

Ordering: MOQ and lead time

These figures are quoted by order type rather than per part number, because the same cell can ship from stock or start a new tooling project. If your quantity sits between two rows, the smaller one applies until a change is needed.

Minimum order quantity

Sample evaluation 1 unit A single piece, so you can test the chemistry and the fit before committing to a batch.
Standard catalogue item 5–10 units The stocked line: cells, cases and components that need no change before shipping.
New ODM design 100–200 sets New structure, new BMS protocol or new housing tooling. The batch size covers the setup work.
Large project quoted per project Container-scale and framework agreements are quoted against the schedule, not against a unit price.

Production lead time

Stock item 3–5 working days Shipped from stock once the order is confirmed.
OEM (silk print, label, packaging only) 15–20 working days Same structure and same BMS. Only the marking and the packaging change.
New ODM (new structure, BMS protocol, housing, diesel-to-electric) 30–35 working days Counted from specification freeze, not from the enquiry.
Adding a certification +15–30 days On top of the production time above. The laboratory sets the schedule, not us.

Shipping transit is quoted separately and starts after production finishes. We do not publish a transit figure, because it depends on the forwarder, the route and the season — ask for it with the order and we will quote the current rate.

Request a quote Ask an engineer Preview the datasheet

Full A4 datasheet, one page. We store the address to answer you — nothing else.

WhatsApp Request a quote