Skip to content
New product 12 V 100 Ah sodium-ion truck starting battery, 1500 CCA, Group 31T See the launch →
Home / Products / Cases / Housings & Brackets / Staggered cell holder bracket — 42 mm pitch
Staggered cell holder bracket — 42 mm pitch

Staggered cell holder bracket — 42 mm pitch

Brand: Polytone
Part number: BRK-STAG-42
Cell size: 40160 series (40 mm class)
Availability: In stock
Price on request — quoted per configuration, quantity and Incoterm.Ask for a price →

Staggered cell holder for large-format cylindrical sodium-ion cells (40160 series and similar). Holds the cells at a fixed 42 mm pitch with a 40.5 mm bore, in a 4-offset / 5-in-line layout — the offset pattern keeps the pack compact while leaving a channel for cooling air.

Layout: 4 staggered rows / 5 straight rows, holes linked by ribs so the sheet stays flat when pressed into the module frame.

Customisation: pitch, bore, row count and material are made to your module drawing.

Specification

Staggered cell holder bracket — 42 mm pitch — specification
Pitch42 mm
Bore40.5 mm
Layout4 staggered / 5 straight
Cell size40160 series (40 mm class)
ApplicationModule cell holder

Ordering: MOQ and lead time

These figures are quoted by order type rather than per part number, because the same cell can ship from stock or start a new tooling project. If your quantity sits between two rows, the smaller one applies until a change is needed.

Minimum order quantity

Sample evaluation 1 unit A single piece, so you can test the chemistry and the fit before committing to a batch.
Standard catalogue item 5–10 units The stocked line: cells, cases and components that need no change before shipping.
New ODM design 100–200 sets New structure, new BMS protocol or new housing tooling. The batch size covers the setup work.
Large project quoted per project Container-scale and framework agreements are quoted against the schedule, not against a unit price.

Production lead time

Stock item 3–5 working days Shipped from stock once the order is confirmed.
OEM (silk print, label, packaging only) 15–20 working days Same structure and same BMS. Only the marking and the packaging change.
New ODM (new structure, BMS protocol, housing, diesel-to-electric) 30–35 working days Counted from specification freeze, not from the enquiry.
Adding a certification +15–30 days On top of the production time above. The laboratory sets the schedule, not us.

Shipping transit is quoted separately and starts after production finishes. We do not publish a transit figure, because it depends on the forwarder, the route and the season — ask for it with the order and we will quote the current rate.

Request a quote Ask an engineer Preview the datasheet

Full A4 datasheet, one page. We store the address to answer you — nothing else.

WhatsApp Request a quote