Skip to content
New product 12 V 100 Ah sodium-ion truck starting battery, 1500 CCA, Group 31T See the launch →
Home / Products / Components / Cathode Materials / Layered Oxide / Sodium iron manganese oxide — Na2/3(Fe1/2Mn1/2)O2 (P2 type)
Sodium iron manganese oxide — Na2/3(Fe1/2Mn1/2)O2 (P2 type)

Sodium iron manganese oxide — Na2/3(Fe1/2Mn1/2)O2 (P2 type)

Brand: Polytone
Part number: PT-CAT-P2-FM
Voltage window: 1.5 – 4.0 V (vs Na/Na+)
Capacity (0.1C): 180 mAh/g
Availability: Sample available
Price on request — quoted per configuration, quantity and Incoterm.Ask for a price →

P2-type sodium iron manganese oxide cathode powder — iron and manganese only, no nickel or cobalt, which is what makes the cost structure work for storage and two-wheeler cells.

Electrochemistry (0.1C, 1.5–4.0 V vs Na/Na+): 180 mAh/g specific discharge capacity; 70% retention after 20 cycles in the reference cell.

Why the voltage window matters: the wide 1.5–4.0 V window is where the headline capacity comes from; a narrower window (2.0–4.0 V) gives longer cycle life at lower capacity, so specify the window with the cell design.

Specifications

Chemical formula Na2/3(Fe1/2Mn1/2)O2
Element ratio Na : Fe : Mn : O = 2/3 : 1/2 : 1/2 : 2 (mol)
Purity ≥ 99.9 wt% (3N)
Structure P2-type layered oxide
Appearance Black powder
D50 (primary) ≤ 3 µm
Capacity (0.1C) 180 mAh/g
Voltage window 1.5 – 4.0 V (vs Na/Na+)
Initial retention 70% after 20 cycles
Impurities Cu ≤12 · Ni ≤35 · Co ≤30 · Ca ≤7 · K ≤15 · Mg ≤20 · Si ≤18 · Al ≤25 · Zr ≤15 ppm
Application Storage, two-wheeler and start-stop cells

Specification

Sodium iron manganese oxide — Na2/3(Fe1/2Mn1/2)O2 (P2 type) — specification
Chemical formulaNa2/3(Fe1/2Mn1/2)O2
Element ratioNa : Fe : Mn : O = 2/3 : 1/2 : 1/2 : 2 (mol)
Purity≥ 99.9 wt% (3N)
StructureP2-type layered oxide
AppearanceBlack powder
D50 (primary)≤ 3 µm
Capacity (0.1C)180 mAh/g
Voltage window1.5 – 4.0 V (vs Na/Na+)
Initial retention70% after 20 cycles
ImpuritiesCu ≤12 · Ni ≤35 · Co ≤30 · Ca ≤7 · K ≤15 · Mg ≤20 · Si ≤18 · Al ≤25 · Zr ≤15 ppm
ApplicationStorage, two-wheeler and start-stop cells

Ordering: MOQ and lead time

These figures are quoted by order type rather than per part number, because the same cell can ship from stock or start a new tooling project. If your quantity sits between two rows, the smaller one applies until a change is needed.

Minimum order quantity

Sample evaluation 1 unit A single piece, so you can test the chemistry and the fit before committing to a batch.
Standard catalogue item 5–10 units The stocked line: cells, cases and components that need no change before shipping.
New ODM design 100–200 sets New structure, new BMS protocol or new housing tooling. The batch size covers the setup work.
Large project quoted per project Container-scale and framework agreements are quoted against the schedule, not against a unit price.

Production lead time

Stock item 3–5 working days Shipped from stock once the order is confirmed.
OEM (silk print, label, packaging only) 15–20 working days Same structure and same BMS. Only the marking and the packaging change.
New ODM (new structure, BMS protocol, housing, diesel-to-electric) 30–35 working days Counted from specification freeze, not from the enquiry.
Adding a certification +15–30 days On top of the production time above. The laboratory sets the schedule, not us.

Shipping transit is quoted separately and starts after production finishes. We do not publish a transit figure, because it depends on the forwarder, the route and the season — ask for it with the order and we will quote the current rate.

Request a quote Ask an engineer Preview the datasheet

Full A4 datasheet, one page. We store the address to answer you — nothing else.

WhatsApp Request a quote