Price on request — quoted per configuration, quantity and Incoterm.Ask for a price →
Standard punched patterns in nickel-plated steel: ladder, grid, window and tab styles. Used for cell interconnection, welding carriers and busbar stiffening.
Customisation: pattern, hole pitch, thickness and plating thickness can all be adjusted to your cell layout.
Material
Nickel-plated steel (Ni / SPCC)
Thickness
0.1 – 0.3 mm
Finish
Nickel plated
Pattern
Standard range
Application
Cell connection, busbar carrier
Datasheet, declarations and warranty terms for this model.
Declaration of conformity and warranty statement are issued with the order. Ask for the current revision if your design is already frozen.
Specification
Nickel-plated steel sheet — standard patterns — specification
Material
Nickel-plated steel (Ni / SPCC)
Thickness
0.1 – 0.3 mm
Finish
Nickel plated
Pattern
Standard range
Application
Cell connection, busbar carrier
Ordering: MOQ and lead time
These figures are quoted by order type rather than per part number, because the same cell can ship from stock or start a new tooling project. If your quantity sits between two rows, the smaller one applies until a change is needed.
Minimum order quantity
Sample evaluation
1 unitA single piece, so you can test the chemistry and the fit before committing to a batch.
Standard catalogue item
5–10 unitsThe stocked line: cells, cases and components that need no change before shipping.
New ODM design
100–200 setsNew structure, new BMS protocol or new housing tooling. The batch size covers the setup work.
Large project
quoted per projectContainer-scale and framework agreements are quoted against the schedule, not against a unit price.
Production lead time
Stock item
3–5 working daysShipped from stock once the order is confirmed.
OEM (silk print, label, packaging only)
15–20 working daysSame structure and same BMS. Only the marking and the packaging change.
New ODM (new structure, BMS protocol, housing, diesel-to-electric)
30–35 working daysCounted from specification freeze, not from the enquiry.
Adding a certification
+15–30 daysOn top of the production time above. The laboratory sets the schedule, not us.
Shipping transit is quoted separately and starts after production finishes. We do not publish a transit figure, because it depends on the forwarder, the route and the season — ask for it with the order and we will quote the current rate.
We use one first-party cookie to remember your language and consent choices. No advertising or cross-site tracking is loaded unless you accept analytics. Read the privacy notice.