Skip to content
New product 12 V 100 Ah sodium-ion truck starting battery, 1500 CCA, Group 31T See the launch →
Home / Products / Components / Insulation & Thermal / Mica paper for induction furnaces — fibreglass reinforced
Large fibreglass composite mica roll

Mica paper for induction furnaces — fibreglass reinforced

Brand: Polytone
Part number: PT-IT-MICA-FN
Continuous temperature: 1000 – 1200 °C
Availability: Made to order
Price on request — quoted per configuration, quantity and Incoterm.Ask for a price →

Mica paper built for induction furnace insulation: gold mica or synthetic mica paper as the base, an alkali-free fibreglass cloth as the reinforcement layer, bonded with a high-temperature silicone resin.

Why the fibreglass layer: the furnace lining moves as it heats and cools. The cloth carries the tensile load and takes the thermal expansion, so the sheet does not split at the coil former.

Temperature: continuous 1000–1200 °C — enough for a melt zone running above 1500 °C behind the lining.

Thickness: 0.12 – 1.0 mm, supplied as a large roll or slit to width.

Specification

Mica paper for induction furnaces — fibreglass reinforced — specification
Base materialGold mica or synthetic mica paper
ReinforcementAlkali-free fibreglass cloth
BinderHigh-temperature silicone resin
Continuous temperature1000 – 1200 °C
Thickness0.12 – 1.0 mm
FormLarge roll or slit roll
ApplicationInduction furnace lining insulation

Ordering: MOQ and lead time

These figures are quoted by order type rather than per part number, because the same cell can ship from stock or start a new tooling project. If your quantity sits between two rows, the smaller one applies until a change is needed.

Minimum order quantity

Sample evaluation 1 unit A single piece, so you can test the chemistry and the fit before committing to a batch.
Standard catalogue item 5–10 units The stocked line: cells, cases and components that need no change before shipping.
New ODM design 100–200 sets New structure, new BMS protocol or new housing tooling. The batch size covers the setup work.
Large project quoted per project Container-scale and framework agreements are quoted against the schedule, not against a unit price.

Production lead time

Stock item 3–5 working days Shipped from stock once the order is confirmed.
OEM (silk print, label, packaging only) 15–20 working days Same structure and same BMS. Only the marking and the packaging change.
New ODM (new structure, BMS protocol, housing, diesel-to-electric) 30–35 working days Counted from specification freeze, not from the enquiry.
Adding a certification +15–30 days On top of the production time above. The laboratory sets the schedule, not us.

Shipping transit is quoted separately and starts after production finishes. We do not publish a transit figure, because it depends on the forwarder, the route and the season — ask for it with the order and we will quote the current rate.

Questions buyers ask

What continuous current can it take?

1000 – 1200 °C. Size the cable and the busbar to this current with margin, and check that the BMS in your build is rated at least as high.

Request a quote Ask an engineer Preview the datasheet

Full A4 datasheet, one page. We store the address to answer you — nothing else.

WhatsApp Request a quote