Testing: 5 V / 10 mA 8-channel tester; enter the active mass, then set current from the target C-rate (0.1C = nominal capacity mAh/g × active mass mg × 0.001 × 0.1).
Storage: seal the sheet immediately after opening — keep it in a glove box or a 60 °C oven.
Sheet size
241 × 200 mm
Coated area
241 × 175 mm (12.5 mm margin each side)
Coating
Single side
Total thickness
80 – 100 µm
Foil thickness
16 µm
Coating density
6.3 ± 0.2 mg/cm²
Foil surface density
4.22 mg/cm²
Active material
92%
Compacted density
0.9 g/cm³
Voltage window
0.005 – 2.0 V
Specific capacity
280 ± 30 mAh/g
Storage
Seal after opening; glove box or 60 °C oven
Application
Sodium-ion coin-cell research
Datasheet, declarations and warranty terms for this model.
Declaration of conformity and warranty statement are issued with the order. Ask for the current revision if your design is already frozen.
Specification
Hard carbon coated aluminium electrode sheet — 241 × 200 mm — specification
Sheet size
241 × 200 mm
Coated area
241 × 175 mm (12.5 mm margin each side)
Coating
Single side
Total thickness
80 – 100 µm
Foil thickness
16 µm
Coating density
6.3 ± 0.2 mg/cm²
Foil surface density
4.22 mg/cm²
Active material
92%
Compacted density
0.9 g/cm³
Voltage window
0.005 – 2.0 V
Specific capacity
280 ± 30 mAh/g
Storage
Seal after opening; glove box or 60 °C oven
Application
Sodium-ion coin-cell research
Ordering: MOQ and lead time
These figures are quoted by order type rather than per part number, because the same cell can ship from stock or start a new tooling project. If your quantity sits between two rows, the smaller one applies until a change is needed.
Minimum order quantity
Sample evaluation
1 unitA single piece, so you can test the chemistry and the fit before committing to a batch.
Standard catalogue item
5–10 unitsThe stocked line: cells, cases and components that need no change before shipping.
New ODM design
100–200 setsNew structure, new BMS protocol or new housing tooling. The batch size covers the setup work.
Large project
quoted per projectContainer-scale and framework agreements are quoted against the schedule, not against a unit price.
Production lead time
Stock item
3–5 working daysShipped from stock once the order is confirmed.
OEM (silk print, label, packaging only)
15–20 working daysSame structure and same BMS. Only the marking and the packaging change.
New ODM (new structure, BMS protocol, housing, diesel-to-electric)
30–35 working daysCounted from specification freeze, not from the enquiry.
Adding a certification
+15–30 daysOn top of the production time above. The laboratory sets the schedule, not us.
Shipping transit is quoted separately and starts after production finishes. We do not publish a transit figure, because it depends on the forwarder, the route and the season — ask for it with the order and we will quote the current rate.
We use one first-party cookie to remember your language and consent choices. No advertising or cross-site tracking is loaded unless you accept analytics. Read the privacy notice.