Price on request — quoted per configuration, quantity and Incoterm.Ask for a price →
Low-density ceramifiable silicone foam for gaskets and pads that have to seal at low closing force. At 20 Shore C it compresses under a light load, so a thin lid or a plastic housing can make the seal without a metal clamp ring.
Ceramifiable: when it meets a flame the silicone burns off and the fillers sinter into a ceramic shell. The shell stays in place and keeps the gap closed instead of leaving a hole.
Compression set: below 2% after 50% compression for 22 h at 100 °C — the seal does not relax over thermal cycles.
Colour
Red / grey / black / white (white in stock)
Thickness
0.5 – 20 mm
Thickness tolerance
±5%
Density
0.42 ± 0.05 g/cm³
Hardness
20 ± 5 Shore C
Compression set
< 2% (50% compression, 22 h, 100 °C)
Continuous temperature
-40 to 200 °C
Intermittent temperature
230 °C
Water absorption
< 1.2% (ASTM D471/D1056)
Tensile strength
≤ 320 kPa (ASTM D412)
Surface
Smooth
Datasheet, declarations and warranty terms for this model.
These figures are quoted by order type rather than per part number, because the same cell can ship from stock or start a new tooling project. If your quantity sits between two rows, the smaller one applies until a change is needed.
Minimum order quantity
Sample evaluation
1 unitA single piece, so you can test the chemistry and the fit before committing to a batch.
Standard catalogue item
5–10 unitsThe stocked line: cells, cases and components that need no change before shipping.
New ODM design
100–200 setsNew structure, new BMS protocol or new housing tooling. The batch size covers the setup work.
Large project
quoted per projectContainer-scale and framework agreements are quoted against the schedule, not against a unit price.
Production lead time
Stock item
3–5 working daysShipped from stock once the order is confirmed.
OEM (silk print, label, packaging only)
15–20 working daysSame structure and same BMS. Only the marking and the packaging change.
New ODM (new structure, BMS protocol, housing, diesel-to-electric)
30–35 working daysCounted from specification freeze, not from the enquiry.
Adding a certification
+15–30 daysOn top of the production time above. The laboratory sets the schedule, not us.
Shipping transit is quoted separately and starts after production finishes. We do not publish a transit figure, because it depends on the forwarder, the route and the season — ask for it with the order and we will quote the current rate.
Questions buyers ask
What continuous current can it take?
-40 to 200 °C. Size the cable and the busbar to this current with margin, and check that the BMS in your build is rated at least as high.
We use one first-party cookie to remember your language and consent choices. No advertising or cross-site tracking is loaded unless you accept analytics. Read the privacy notice.