Price on request — quoted per configuration, quantity and Incoterm.Ask for a price →
Carbon-coated NASICON-type sodium vanadium phosphate (NVP) cathode powder. The carbon coating lifts electronic conductivity, which is the usual weak point of NVP, and the NASICON framework gives a very flat 3.4 V plateau with long cycle life.
Coin-cell reference: tested against sodium, 2.5–3.85 V; slurry ratio active : SP : PVDF = 80 : 10 : 10 wt%.
Specifications
Chemical formula
Na3V2(PO4)3 (carbon coated)
Structure
NASICON (polyanion)
Purity
3N (≥ 99.9 wt%)
Particle size
1 – 2 µm
Carbon content
3.97 wt%
Element ratio
Na : V : P : O = 3 : 2 : 3 : 12 (mol)
Colour
Grey-black
Voltage window
2.5 – 3.85 V (vs Na)
Slurry ratio
Active : SP : PVDF = 80 : 10 : 10 wt%
Impurities
Fe 10 · Cu 6 · Ni 20 · Ba 5 · Ca 7 · K 5 · Mg 15 · Si 30 · Al 35 · Zr 18 ppm
Application
Long-cycle storage, high-safety cells
Chemical formula
Na3V2(PO4)3 (carbon coated)
Structure
NASICON (polyanion)
Purity
3N (≥ 99.9 wt%)
Particle size
1 – 2 µm
Carbon content
3.97 wt%
Element ratio
Na : V : P : O = 3 : 2 : 3 : 12 (mol)
Colour
Grey-black
Voltage window
2.5 – 3.85 V (vs Na)
Slurry ratio
Active : SP : PVDF = 80 : 10 : 10 wt%
Impurities
Fe 10 · Cu 6 · Ni 20 · Ba 5 · Ca 7 · K 5 · Mg 15 · Si 30 · Al 35 · Zr 18 ppm
Application
Long-cycle storage, high-safety cells
Datasheet, declarations and warranty terms for this model.
Fe 10 · Cu 6 · Ni 20 · Ba 5 · Ca 7 · K 5 · Mg 15 · Si 30 · Al 35 · Zr 18 ppm
Application
Long-cycle storage, high-safety cells
Ordering: MOQ and lead time
These figures are quoted by order type rather than per part number, because the same cell can ship from stock or start a new tooling project. If your quantity sits between two rows, the smaller one applies until a change is needed.
Minimum order quantity
Sample evaluation
1 unitA single piece, so you can test the chemistry and the fit before committing to a batch.
Standard catalogue item
5–10 unitsThe stocked line: cells, cases and components that need no change before shipping.
New ODM design
100–200 setsNew structure, new BMS protocol or new housing tooling. The batch size covers the setup work.
Large project
quoted per projectContainer-scale and framework agreements are quoted against the schedule, not against a unit price.
Production lead time
Stock item
3–5 working daysShipped from stock once the order is confirmed.
OEM (silk print, label, packaging only)
15–20 working daysSame structure and same BMS. Only the marking and the packaging change.
New ODM (new structure, BMS protocol, housing, diesel-to-electric)
30–35 working daysCounted from specification freeze, not from the enquiry.
Adding a certification
+15–30 daysOn top of the production time above. The laboratory sets the schedule, not us.
Shipping transit is quoted separately and starts after production finishes. We do not publish a transit figure, because it depends on the forwarder, the route and the season — ask for it with the order and we will quote the current rate.
We use one first-party cookie to remember your language and consent choices. No advertising or cross-site tracking is loaded unless you accept analytics. Read the privacy notice.