Skip to content
New product 12 V 100 Ah sodium-ion truck starting battery, 1500 CCA, Group 31T See the launch →
Home / Products / Components / Cathode Materials / Polyanion (NFPP / NVP) / Carbon-coated sodium vanadium phosphate — Na3V2(PO4)3 (NVP)
Carbon-coated sodium vanadium phosphate — Na3V2(PO4)3 (NVP)

Carbon-coated sodium vanadium phosphate — Na3V2(PO4)3 (NVP)

Brand: Polytone
Part number: PT-CAT-NVP
Voltage window: 2.5 – 3.85 V (vs Na)
Particle size: 1 – 2 µm
Availability: Sample available
Price on request — quoted per configuration, quantity and Incoterm.Ask for a price →

Carbon-coated NASICON-type sodium vanadium phosphate (NVP) cathode powder. The carbon coating lifts electronic conductivity, which is the usual weak point of NVP, and the NASICON framework gives a very flat 3.4 V plateau with long cycle life.

Coin-cell reference: tested against sodium, 2.5–3.85 V; slurry ratio active : SP : PVDF = 80 : 10 : 10 wt%.

Specifications

Chemical formula Na3V2(PO4)3 (carbon coated)
Structure NASICON (polyanion)
Purity 3N (≥ 99.9 wt%)
Particle size 1 – 2 µm
Carbon content 3.97 wt%
Element ratio Na : V : P : O = 3 : 2 : 3 : 12 (mol)
Colour Grey-black
Voltage window 2.5 – 3.85 V (vs Na)
Slurry ratio Active : SP : PVDF = 80 : 10 : 10 wt%
Impurities Fe 10 · Cu 6 · Ni 20 · Ba 5 · Ca 7 · K 5 · Mg 15 · Si 30 · Al 35 · Zr 18 ppm
Application Long-cycle storage, high-safety cells

Specification

Carbon-coated sodium vanadium phosphate — Na3V2(PO4)3 (NVP) — specification
Chemical formulaNa3V2(PO4)3 (carbon coated)
StructureNASICON (polyanion)
Purity3N (≥ 99.9 wt%)
Particle size1 – 2 µm
Carbon content3.97 wt%
Element ratioNa : V : P : O = 3 : 2 : 3 : 12 (mol)
ColourGrey-black
Voltage window2.5 – 3.85 V (vs Na)
Slurry ratioActive : SP : PVDF = 80 : 10 : 10 wt%
ImpuritiesFe 10 · Cu 6 · Ni 20 · Ba 5 · Ca 7 · K 5 · Mg 15 · Si 30 · Al 35 · Zr 18 ppm
ApplicationLong-cycle storage, high-safety cells

Ordering: MOQ and lead time

These figures are quoted by order type rather than per part number, because the same cell can ship from stock or start a new tooling project. If your quantity sits between two rows, the smaller one applies until a change is needed.

Minimum order quantity

Sample evaluation 1 unit A single piece, so you can test the chemistry and the fit before committing to a batch.
Standard catalogue item 5–10 units The stocked line: cells, cases and components that need no change before shipping.
New ODM design 100–200 sets New structure, new BMS protocol or new housing tooling. The batch size covers the setup work.
Large project quoted per project Container-scale and framework agreements are quoted against the schedule, not against a unit price.

Production lead time

Stock item 3–5 working days Shipped from stock once the order is confirmed.
OEM (silk print, label, packaging only) 15–20 working days Same structure and same BMS. Only the marking and the packaging change.
New ODM (new structure, BMS protocol, housing, diesel-to-electric) 30–35 working days Counted from specification freeze, not from the enquiry.
Adding a certification +15–30 days On top of the production time above. The laboratory sets the schedule, not us.

Shipping transit is quoted separately and starts after production finishes. We do not publish a transit figure, because it depends on the forwarder, the route and the season — ask for it with the order and we will quote the current rate.

Request a quote Ask an engineer Preview the datasheet

Full A4 datasheet, one page. We store the address to answer you — nothing else.

WhatsApp Request a quote