Price on request — quoted per configuration, quantity and Incoterm.Ask for a price →
16S 200 A battery management board for the 15 kWh / 51.2 V cabinet, supplied with the display, the balance and sense harnesses, and the temperature probes. The board mounts on the cabinet back plate and the display drops into the lid cut-out.
Part of: PT-ESS-15K 15 kWh sodium-ion storage cabinet.
Configuration
16S (51.2 V)
Continuous current
200 A
Display
LCD included
Harnesses
Balance, sense and temperature leads included
Application
15 kWh cabinet (PT-ESS-15K)
Datasheet, declarations and warranty terms for this model.
Declaration of conformity and warranty statement are issued with the order. Ask for the current revision if your design is already frozen.
Specification
BMS 16S 200 A with display — specification
Configuration
16S (51.2 V)
Continuous current
200 A
Display
LCD included
Harnesses
Balance, sense and temperature leads included
Application
15 kWh cabinet (PT-ESS-15K)
Ordering: MOQ and lead time
These figures are quoted by order type rather than per part number, because the same cell can ship from stock or start a new tooling project. If your quantity sits between two rows, the smaller one applies until a change is needed.
Minimum order quantity
Sample evaluation
1 unitA single piece, so you can test the chemistry and the fit before committing to a batch.
Standard catalogue item
5–10 unitsThe stocked line: cells, cases and components that need no change before shipping.
New ODM design
100–200 setsNew structure, new BMS protocol or new housing tooling. The batch size covers the setup work.
Large project
quoted per projectContainer-scale and framework agreements are quoted against the schedule, not against a unit price.
Production lead time
Stock item
3–5 working daysShipped from stock once the order is confirmed.
OEM (silk print, label, packaging only)
15–20 working daysSame structure and same BMS. Only the marking and the packaging change.
New ODM (new structure, BMS protocol, housing, diesel-to-electric)
30–35 working daysCounted from specification freeze, not from the enquiry.
Adding a certification
+15–30 daysOn top of the production time above. The laboratory sets the schedule, not us.
Shipping transit is quoted separately and starts after production finishes. We do not publish a transit figure, because it depends on the forwarder, the route and the season — ask for it with the order and we will quote the current rate.
Questions buyers ask
What continuous current can it take?
200 A. Size the cable and the busbar to this current with margin, and check that the BMS in your build is rated at least as high.
We use one first-party cookie to remember your language and consent choices. No advertising or cross-site tracking is loaded unless you accept analytics. Read the privacy notice.