Skip to content
New product 12 V 100 Ah sodium-ion truck starting battery, 1500 CCA, Group 31T See the launch →
Home / Products / Components / Conductive Parts / Busbars & Nickel Sheet / Aluminium bar with nickel tab
Aluminium bar with nickel tab

Aluminium bar with nickel tab

Brand: Polytone
Part number: BB-AL-NITAB
Availability: In stock
Price on request — quoted per configuration, quantity and Incoterm.Ask for a price →

An aluminium bar with a nickel tab welded on one end: the aluminium does the current-carrying and the nickel end is what the cell tab can actually be welded to. The transition is made by friction welding, so the joint resistance stays low.

When to use it

Where an aluminium conductor has to meet a nickel or nickel-plated cell tab. Trying to weld aluminium directly to nickel produces a brittle intermetallic and a joint that fails in service.

Where it does not fit

The transition zone adds length, so it will not fit a tight stack. For a joint that is bolted rather than welded, a plain aluminium bar with a pressed nut is cheaper and does the same job.

Specification

Aluminium bar with nickel tab — specification
MaterialAluminium bar with nickel tab
FeatureLow-resistance transition · easy welding

Ordering: MOQ and lead time

These figures are quoted by order type rather than per part number, because the same cell can ship from stock or start a new tooling project. If your quantity sits between two rows, the smaller one applies until a change is needed.

Minimum order quantity

Sample evaluation 1 unit A single piece, so you can test the chemistry and the fit before committing to a batch.
Standard catalogue item 5–10 units The stocked line: cells, cases and components that need no change before shipping.
New ODM design 100–200 sets New structure, new BMS protocol or new housing tooling. The batch size covers the setup work.
Large project quoted per project Container-scale and framework agreements are quoted against the schedule, not against a unit price.

Production lead time

Stock item 3–5 working days Shipped from stock once the order is confirmed.
OEM (silk print, label, packaging only) 15–20 working days Same structure and same BMS. Only the marking and the packaging change.
New ODM (new structure, BMS protocol, housing, diesel-to-electric) 30–35 working days Counted from specification freeze, not from the enquiry.
Adding a certification +15–30 days On top of the production time above. The laboratory sets the schedule, not us.

Shipping transit is quoted separately and starts after production finishes. We do not publish a transit figure, because it depends on the forwarder, the route and the season — ask for it with the order and we will quote the current rate.

Request a quote Ask an engineer Preview the datasheet

Full A4 datasheet, one page. We store the address to answer you — nothing else.

WhatsApp Request a quote