These figures are quoted by order type rather than per part number, because the same cell can ship from stock or start a new tooling project. If your quantity sits between two rows, the smaller one applies until a change is needed.
Minimum order quantity
Sample evaluation
1 unitA single piece, so you can test the chemistry and the fit before committing to a batch.
Standard catalogue item
5–10 unitsThe stocked line: cells, cases and components that need no change before shipping.
New ODM design
100–200 setsNew structure, new BMS protocol or new housing tooling. The batch size covers the setup work.
Large project
quoted per projectContainer-scale and framework agreements are quoted against the schedule, not against a unit price.
Production lead time
Stock item
3–5 working daysShipped from stock once the order is confirmed.
OEM (silk print, label, packaging only)
15–20 working daysSame structure and same BMS. Only the marking and the packaging change.
New ODM (new structure, BMS protocol, housing, diesel-to-electric)
30–35 working daysCounted from specification freeze, not from the enquiry.
Adding a certification
+15–30 daysOn top of the production time above. The laboratory sets the schedule, not us.
Shipping transit is quoted separately and starts after production finishes. We do not publish a transit figure, because it depends on the forwarder, the route and the season — ask for it with the order and we will quote the current rate.
Questions buyers ask
What voltage and capacity does this come in?
3.0 V nominal, 5.5 Ah capacity. The figures are the ones on the specification table on this page, not a range across the family.
What are the dimensions?
(W × H × T) 145 ± 0.5 × 138 ± 1 × 5.8 ± 0.2 mm. Check the mounting space against this figure rather than against the catalogue photo, because the enclosure adds wall thickness on every side.
How much does it weigh?
185 ± 10 g. For freight the packed weight is higher: crating and pallet add to this figure, so ask for the shipping weight when you book.
What cycle life is quoted?
≥80% capacity retention after 3,000 cycles(1C / 1C, 25 °C). A cycle figure only means something with its rate, temperature and end-of-life criterion, which is why we quote the condition next to the number instead of a bare count.
What continuous current can it take?
40C / 80C. Size the cable and the busbar to this current with margin, and check that the BMS in your build is rated at least as high.