Skip to content
New product 12 V 100 Ah sodium-ion truck starting battery, 1500 CCA, Group 31T See the launch →
46140 connector plate

46140 connector plate

Brand: Polytone
Part number: BB-46140
Availability: In stock
Price on request — quoted per configuration, quantity and Incoterm.Ask for a price →

A connector plate for 46140 and 46160 cells, supplied in more than one structure and size so the plate can match the terminal spacing of the specific cell. Both cell sizes share a terminal pitch family, which is why one plate family covers both.

When to use it

When the pack is built from 46140 or 46160 cells and the busbar has to be laser-welded rather than bolted. The selectable size lets one drawing serve two builds.

Where it does not fit

Not interchangeable with a 32140 or 40160 plate — the spacing is different and the plate will sit at an angle. For a bolted joint, a plate with pressed nuts is the better choice.

Specification

46140 connector plate — specification
Material46140 connector plate
FeatureMultiple structures · selectable size

Ordering: MOQ and lead time

These figures are quoted by order type rather than per part number, because the same cell can ship from stock or start a new tooling project. If your quantity sits between two rows, the smaller one applies until a change is needed.

Minimum order quantity

Sample evaluation 1 unit A single piece, so you can test the chemistry and the fit before committing to a batch.
Standard catalogue item 5–10 units The stocked line: cells, cases and components that need no change before shipping.
New ODM design 100–200 sets New structure, new BMS protocol or new housing tooling. The batch size covers the setup work.
Large project quoted per project Container-scale and framework agreements are quoted against the schedule, not against a unit price.

Production lead time

Stock item 3–5 working days Shipped from stock once the order is confirmed.
OEM (silk print, label, packaging only) 15–20 working days Same structure and same BMS. Only the marking and the packaging change.
New ODM (new structure, BMS protocol, housing, diesel-to-electric) 30–35 working days Counted from specification freeze, not from the enquiry.
Adding a certification +15–30 days On top of the production time above. The laboratory sets the schedule, not us.

Shipping transit is quoted separately and starts after production finishes. We do not publish a transit figure, because it depends on the forwarder, the route and the season — ask for it with the order and we will quote the current rate.

Request a quote Ask an engineer Preview the datasheet

Full A4 datasheet, one page. We store the address to answer you — nothing else.

WhatsApp Request a quote