Pairing a bracket with the cavity sets how many cells go in, and that sets the capacity. Tell us the cell format and we will confirm the fit.
Two-piece cell holder for 2, 3 and 4-wheel EV packs. The upper plate locates the cells, the lower plate carries the underside and the fixing points; the two are screwed together around the cell stack, so the pack holds its shape under vibration.
Specification
Bracket type: Splicing
Upper bracket: 128.2 × 65.1 × 36 mm
Lower bracket: 128.2 × 65.1 × 30 mm
What it is for
Supplied as a matched pair. Tell us the cell you are building with and the series / parallel count you need and we will confirm the pitch, the plate spacing and the fixing holes before you order.
Bracket type
Splicing
Upper bracket
128.2 × 65.1 × 36 mm
Lower bracket
128.2 × 65.1 × 30 mm
Datasheet, declarations and warranty terms for this model.
These figures are quoted by order type rather than per part number, because the same cell can ship from stock or start a new tooling project. If your quantity sits between two rows, the smaller one applies until a change is needed.
Minimum order quantity
Sample evaluation
1 unitA single piece, so you can test the chemistry and the fit before committing to a batch.
Standard catalogue item
5–10 unitsThe stocked line: cells, cases and components that need no change before shipping.
New ODM design
100–200 setsNew structure, new BMS protocol or new housing tooling. The batch size covers the setup work.
Large project
quoted per projectContainer-scale and framework agreements are quoted against the schedule, not against a unit price.
Production lead time
Stock item
3–5 working daysShipped from stock once the order is confirmed.
OEM (silk print, label, packaging only)
15–20 working daysSame structure and same BMS. Only the marking and the packaging change.
New ODM (new structure, BMS protocol, housing, diesel-to-electric)
30–35 working daysCounted from specification freeze, not from the enquiry.
Adding a certification
+15–30 daysOn top of the production time above. The laboratory sets the schedule, not us.
Shipping transit is quoted separately and starts after production finishes. We do not publish a transit figure, because it depends on the forwarder, the route and the season — ask for it with the order and we will quote the current rate.
We use one first-party cookie to remember your language and consent choices. No advertising or cross-site tracking is loaded unless you accept analytics. Read the privacy notice.