Skip to content
New product 12 V 100 Ah sodium-ion truck starting battery, 1500 CCA, Group 31T See the launch →
21Ah copper plate

21Ah copper plate

Brand: Polytone
Part number: BB-CU-21AH
Availability: In stock
Price on request — quoted per configuration, quantity and Incoterm.Ask for a price →

A copper connecting plate for 21 Ah cells, drilled multi-hole to tie several terminals in one plane. Copper rather than aluminium because the plate is expected to carry the full module current with a low voltage drop.

When to use it

Where the cell pitch is fixed by the holder and the joint has to stay flat across four or more terminals. Multi-hole drilling spreads the contact area, which keeps the joint temperature down at high rate.

Where it does not fit

Not for an aluminium tab without a transition: copper cannot be welded directly to aluminium, so a bimetallic sheet has to sit between them. And a rigid plate should not be used where the stack moves — it will fatigue at the hole edge.

Specification

21Ah copper plate — specification
Material21Ah copper plate
FeatureMulti-hole · high conductivity

Ordering: MOQ and lead time

These figures are quoted by order type rather than per part number, because the same cell can ship from stock or start a new tooling project. If your quantity sits between two rows, the smaller one applies until a change is needed.

Minimum order quantity

Sample evaluation 1 unit A single piece, so you can test the chemistry and the fit before committing to a batch.
Standard catalogue item 5–10 units The stocked line: cells, cases and components that need no change before shipping.
New ODM design 100–200 sets New structure, new BMS protocol or new housing tooling. The batch size covers the setup work.
Large project quoted per project Container-scale and framework agreements are quoted against the schedule, not against a unit price.

Production lead time

Stock item 3–5 working days Shipped from stock once the order is confirmed.
OEM (silk print, label, packaging only) 15–20 working days Same structure and same BMS. Only the marking and the packaging change.
New ODM (new structure, BMS protocol, housing, diesel-to-electric) 30–35 working days Counted from specification freeze, not from the enquiry.
Adding a certification +15–30 days On top of the production time above. The laboratory sets the schedule, not us.

Shipping transit is quoted separately and starts after production finishes. We do not publish a transit figure, because it depends on the forwarder, the route and the season — ask for it with the order and we will quote the current rate.

Request a quote Ask an engineer Preview the datasheet

Full A4 datasheet, one page. We store the address to answer you — nothing else.

WhatsApp Request a quote