Skip to content
New product 12 V 100 Ah sodium-ion truck starting battery, 1500 CCA, Group 31T See the launch →
Home / Products / Components / Cell brackets / 20P integral cell bracket, 60140 cells — L224 × W342 mm
20P integral cell bracket, 60140 cells — L224 × W342 mm

20P integral cell bracket, 60140 cells — L224 × W342 mm

Brand: Polytone
Part number: BRK-20P-60140-224342
Availability: In stock
Price on request — quoted per configuration, quantity and Incoterm.Ask for a price →

Matching parts

Pairing a bracket with the cavity sets how many cells go in, and that sets the capacity. Tell us the cell format and we will confirm the fit.

Two-piece cell holder for 2, 3 and 4-wheel EV packs. The upper plate locates the cells, the lower plate carries the underside and the fixing points; the two are screwed together around the cell stack, so the pack holds its shape under vibration.

Specification

  • Bracket type: Integral, 60140 cell holder
  • Upper bracket: 224 × 342 × 36 mm
  • Lower bracket: 224 × 342 × 30 mm
  • Cell format: 60140 cylindrical

What it is for

Supplied as a matched pair. Tell us the cell you are building with and the series / parallel count you need and we will confirm the pitch, the plate spacing and the fixing holes before you order.

Specification

20P integral cell bracket, 60140 cells — L224 × W342 mm — specification
Bracket typeIntegral, 60140 cell holder
Upper bracket224 × 342 × 36 mm
Lower bracket224 × 342 × 30 mm
Cell format60140 cylindrical

Ordering: MOQ and lead time

These figures are quoted by order type rather than per part number, because the same cell can ship from stock or start a new tooling project. If your quantity sits between two rows, the smaller one applies until a change is needed.

Minimum order quantity

Sample evaluation 1 unit A single piece, so you can test the chemistry and the fit before committing to a batch.
Standard catalogue item 5–10 units The stocked line: cells, cases and components that need no change before shipping.
New ODM design 100–200 sets New structure, new BMS protocol or new housing tooling. The batch size covers the setup work.
Large project quoted per project Container-scale and framework agreements are quoted against the schedule, not against a unit price.

Production lead time

Stock item 3–5 working days Shipped from stock once the order is confirmed.
OEM (silk print, label, packaging only) 15–20 working days Same structure and same BMS. Only the marking and the packaging change.
New ODM (new structure, BMS protocol, housing, diesel-to-electric) 30–35 working days Counted from specification freeze, not from the enquiry.
Adding a certification +15–30 days On top of the production time above. The laboratory sets the schedule, not us.

Shipping transit is quoted separately and starts after production finishes. We do not publish a transit figure, because it depends on the forwarder, the route and the season — ask for it with the order and we will quote the current rate.

Request a quote Ask an engineer Preview the datasheet

Full A4 datasheet, one page. We store the address to answer you — nothing else.

WhatsApp Request a quote