Skip to content
New product 12 V 100 Ah sodium-ion truck starting battery, 1500 CCA, Group 31T See the launch →
Home / Products / Components / Cell Holders / 1×4 cylindrical cell holder — 32# series
1x4 cylindrical cell holder strip

1×4 cylindrical cell holder — 32# series

Brand: Polytone
Part number: PT-CH-01
Availability: In stock
Price on request — quoted per configuration, quantity and Incoterm.Ask for a price →

Cell holder for cylindrical sodium-ion cells — 32# 1×4, 4-position strip, moulded in PP. 4-cell strip for 32-series cylindrical cells.

What the holder does: sets the pitch between cells, keeps the stack square while the busbars go on, and leaves a defined gap for cooling air or potting.

Fits: 33140 / 32135 / 40135 series cells — check the bore and pitch against your cell drawing before ordering.

Specification

1×4 cylindrical cell holder — 32# series — specification
Layout32# 1×4, 4-position strip
MaterialPP
Cell series32135 (32 mm)
ApplicationCylindrical cell module assembly

Ordering: MOQ and lead time

These figures are quoted by order type rather than per part number, because the same cell can ship from stock or start a new tooling project. If your quantity sits between two rows, the smaller one applies until a change is needed.

Minimum order quantity

Sample evaluation 1 unit A single piece, so you can test the chemistry and the fit before committing to a batch.
Standard catalogue item 5–10 units The stocked line: cells, cases and components that need no change before shipping.
New ODM design 100–200 sets New structure, new BMS protocol or new housing tooling. The batch size covers the setup work.
Large project quoted per project Container-scale and framework agreements are quoted against the schedule, not against a unit price.

Production lead time

Stock item 3–5 working days Shipped from stock once the order is confirmed.
OEM (silk print, label, packaging only) 15–20 working days Same structure and same BMS. Only the marking and the packaging change.
New ODM (new structure, BMS protocol, housing, diesel-to-electric) 30–35 working days Counted from specification freeze, not from the enquiry.
Adding a certification +15–30 days On top of the production time above. The laboratory sets the schedule, not us.

Shipping transit is quoted separately and starts after production finishes. We do not publish a transit figure, because it depends on the forwarder, the route and the season — ask for it with the order and we will quote the current rate.

Request a quote Ask an engineer Preview the datasheet

Full A4 datasheet, one page. We store the address to answer you — nothing else.

WhatsApp Request a quote