Innovate. Grow. Advance.
Polytone Technology Co., Ltd.
Shenzhen, Guangdong, China
nacellpower.com
jayhan@okiatec.com · 0755-83202104
OEM & custom datasheet
Sodium-ion Pouch Cell, 20 Ah, MR20B
Part number MR20B Brand Polytone
Issued 17 Nov 2026
Capacity20 Ah
ChemistrySodium-ion (Na-ion)
Cell dimensions90 × 159 × 235 mm (90159235)
Weight0.55 ±0.02 kg
Cycle life at 25 °C≥3,000 cycles
Continuous charge1C continuous charge and discharge
Overview
20 Ah sodium-ion pouch cell for two- and three-wheel electric motorcycles, In development. NFPP / hard carbon, 0.55 ±0.02 kg
Specification
| Capacity | 20 Ah |
| Model | MR20B |
| Status | In development |
| Chemistry | Sodium-ion (Na-ion) |
| Cathode material | NFPP / hard carbon |
| Form | Pouch |
| Nominal capacity | 20 Ah |
| Cell dimensions | 90 × 159 × 235 mm (90159235) |
| Weight | 0.55 ±0.02 kg |
| AC internal resistance | ≤1.0 mΩ |
| DC internal resistance | ≤2 mΩ |
| Energy density | ≥105 Wh/kg |
| Volumetric density | ≥170 Wh/L |
| Cycle life at 25 °C | ≥3,000 cycles |
| Cycle life at 45 °C | ≥1,500 cycles |
| Continuous charge | 1C continuous charge and discharge |
| Application | Two- and three-wheel electric motorcycles |
| Standard | GB 43854-2024 — safety technical specification for batteries used in electric bicycles |
Ordering
Minimum order quantity
- Sample evaluation — 1 unit
- Standard catalogue item — 5–10 units
- New ODM design — 100–200 sets
- Large project — quoted per project
Production lead time
- Stock item — 3–5 working days
- OEM (print, label, packaging) — 15–20 working days
- New ODM — 30–35 working days
- Adding a certification — +15–30 days
Polytone Technology Co., Ltd.
Floor 5, Block A & E, Donghaiwang Industrial District,
Longgang District, Shenzhen, Guangdong, China
nacellpower.com
jayhan@okiatec.com
+852 9593 9048 (WhatsApp)
Figures are as recorded for this model and are quoted for the stated test conditions. Cells and packs ship as Class 9 dangerous goods with UN 38.3 and MSDS documentation. Specifications may be revised without notice; confirm the current revision with our team before design freeze.